Planning Zones

Northwest Zone
Northeast Zone
West Central Zone
Twin Cities Zone
Southwest Zone
Southeast Zone

MN Counties (large map)

Sponsoring Utilities
American Transmission Company
Central Minnesota Power Agency/Services
Dairyland Power Cooperative
East River Electric Power Cooperative
Great River Energy
ITC Midwest
L&O Power Cooperative
Minnesota Power
Minnkota Power Cooperative
Missouri River Energy
Otter Tail Power Company
Rochester Public Utilities Commission
Southern Minnesota
Municipal Power Agency
Xcel Energy
Participating Government Agencies
Minnesota Public Utililities Commission
Minnesota Department of Commerce
Environmental Quality Board
Related Links
North American Electric Reliability Council
Midcontinent ISO
National Electric Safety Code
US Department of Energy
Grid North Partners (successor to CapX2020)

Studies and Reports > 2009 MN Biennial Report > WC Planning Zone

To inquire about this project, click here.


Transmission Projects Report 2009
Section 6.4: West Central Zone
 
p. 136

6.4 West Central Zone

The following table provides a list of transmission needs identified in the West Central Zone and the map following the table shows the location of each item in the table. Each item is discussed in more detail in the sections following the map.

Map ID

Tracking Number
Description
Projected
In-Service Year
Need Driver
Section No.
A 2003-WC-N4 To be Determined
Benton County 230/115 kV transformer overload; Low voltages in St. Cloud and Stearns County; Monticello-St. Cloud 115 kV line overload; Sauk River – St. Cloud 115 kV line overload
6.4.2
B 2003-WC-N5 2012
Willmar 115/69 kV transformer overload; Low voltages in Kandiyohi County
6.4.3
C 2003-WC-N7 2012
Crooks-Emmet 69 kV line overload; Olivia low voltage; Brownton low voltage; Hector low voltage
6.4.4
D 2003-WC-N8 2016
Low Voltage problems in the West St. Cloud area, transmission line loading problems on West St. Cloud to Douglas County 69 kV system
6.4.5
E 2003-WC-N9 2009
West St. Cloud 115/69 kV transformer overload and West St. Cloud area low voltage problems; Blue Heron-Wakefield line overload
6.4.6
F 2005-WC-N1 2013
New generation interconnection
6.4.7
G 2005-CX-1

6.4.8
H 2007-WC-N2 2012
Big Stone II Interconnection Upgrade
6.4.9
I 2007-WC-N3 2012
Big Stone II Delivery Upgrade
6.4.10
J 2007-WC-N4 To be Determined
Upgrade facilities that limit generation outlet
6.4.11
K 2009-WC-N1 2012
Low voltages at Sauk Centre Substation
6.4.12
L 2009-WC-N2 2010
Douglas County 115/69 kV transformer outage and resulting low voltages
6.4.13
M 2009-WC-N3 2014
Maynard – Kerkhoven Tap 115 kV line overload
6.4.14
N 2009-WC-N4 2010
Load Growth
6.4.15
O 2009-WC-N5 2010
Low voltage problems in the Watkins area, Maple Lake to Annandale 69 kV line overload
6.4.16
P 2009-WC-N6 2013
Loading concerns on the 69kV system between Elk River and Liberty substation and XFR llad at the substation
6.4.17
Q 2009-WC-N7 2012
Low voltages along Westport to Lowrey
6.4.18

Gray shading denotes project not located on map because it encompasses too large an area.

Click on a letter in the map to see project information. Click here for enlarged view of map.

St. Cloud Area


Map ID: A
Tracking No. 2003-WC-N4 Projected in-service: TBD
Need: Benton County 230/115 kV transformer overload; low voltages in St. Cloud and Stearns County; Monticello-St. Cloud 115 kV line overload; Sauk River-St. Cloud 115 kV line overload
Section No. 6.4.2
Project Information
Contact Us

West St. Cloud Area


Map ID: E
Tracking No. 2003-WC-N9
Projected in-service: 2009
Need: West St. Cloud 115/69-kV transformer overload and West St. Cloud area low voltage problems; Blue
Heron-Wakefield line overload
Section No. 6.4.6
Project Information
Contact Us

Wilmar-Litchfield-Paynesville Area


Map ID: B
Tracking No. 2003-WC-N5
Projected in-service: 2012
Need: Wilmar 115/69 kV transformer overload; low voltages in Kandiyohi County
Section No. 6.4.3
Project Information
Contact Us

Panther area


Map ID: C
Tracking No. 2003-WC-N7
Projected in-service: 2012
Need: Crooks-Emmet 69-kV line overload; Olivia low voltage; Hector low voltage
Section No. 6.4.4
Project Information
Contact Us

Douglas Cty-Paynesville-Wakefield-W. St. Cloud


Map ID: D
Tracking No. 2003-WC-N8
Projected in-service: 2016
Need: Low voltage problems in the West St. Cloud area; transmission line loading problems on West St. Cloud to Douglas County 69-kV system
Section No. 6.4.5
Project Information
Contact Us

Big Stone II Interconnection


Map ID: F
Tracking No. 2005-WC-N1
Project in-service: 2013
Need: New generation interconnection
Section No. 6.4.7
Project Information
Contact Us

Morris 230/115-kV transformer


Map ID: H
Tracking No. 2007-WC-N2
Project in-service: 2012
Nee: Big Stone II Interconnection upgrade
Section No. 6.4.9
Project Information
Contact Us

Morris-Grant County 115-kV line


Map ID: I
Tracking No. 2007-WC-N3
Projected in-service: 2012
Need: Big Stone II delivery upgrade
Section No. 6.4.10
Project Information
Contact Us

West Central Minnesota generation outlet


Map ID: J
Tracking No. 2007-WC-N4
Projected in-service: TBD
Need: Upgrade facilities that limit generation outlet
Section No. 6.4.11
Project Information
Contact Us

Osakis-Sauk Centre


Map ID: K
Tracking No. 2009-WC-N1
Projected in-service: 2012
Need: Low voltages at Sauk Centre substation
Section no. 6.4.12
Project Information
Contact Us

Douglas County Area


Map ID: L
Tracking No. 2009-WC-N2
Douglas County area
Projected in-service: 2010
Need: Douglas County 115/69-kV transformer outage and resulting low voltages
Section No. 6.4.13
Project Information
Contact Us

Maynard – Kerkhoven


Map ID: M
Tracking No. 2009-WC-N3
Projected in-service: 2014
Need: Maynard-Kerkhoven tap 115-kV line overload
Section No. 6.4.14
Project Information
Contact Us

Sartell distribution substation


Map ID: N
Tracking No. 2009-WC-N4
Projected in-service: 2010
Need: Load growth in Sartell area
Section No. 6.4.15
Project Information
Contact Us

Wakefield-Paynesville-Maple Lake Area


Map ID: O
Tracking No. 2009-WC-N5
Projected in-service: 2010
Need: Low voltage problems in the Watkins area, Maple Lake-Annandale 69-kV line overload
Section No. 6.4.16
Project Information
Contact Us

Elk River-Becker Area


Map ID: P
Tracking No. 2009-WC-N6
Projected in-service: 2013
Need: Loading concerns on the 69-kV system between Elk River and Liberty substation and XFR llad at the substation
Section No. 6.4.17
Project Information
Contact Us

Brooten-Lowrey


Map ID: Q
Tracking No. 2009-WC-N7
Projected in-service: 2012
Need: Low voltages along Westport to Lowrey
Section No. 6.4.18
Project Information
Contact Us

6.4.1 Completed Projects

There are two Tracking Numbers that were reported in the 2007 Biennial Report in the West Central Zone that have been addressed. Information about each of the completed projects is summarized briefly in the table below, and those matters will be removed from the list of inadequacies that are discussed in the 2009 Report. More detailed information about these projects and inadequacies can be found in the 2005 and 2007 Reports and in the PUC Docket for the matter if the project fell within the jurisdiction of the Public Utilities Commission, in which case the Docket Number is shown below. Also, additional information is available by contacting the designated person for the utility that was responsible for constructing the project.

Tracking Number
Utility
Description
PUC Docket
Date Completed
2003-WC-N10
Otter Tail Power Company
Appleton – Canby
41.6 kV to 115 kV Line Rebuild
CN-06-677
TL-06-1265
April 2009
2005-WC-N3
Xcel Energy, Great
River Energy

Buffalo Area, Wright County
5-mile 115 kV line between Mary Lake and Buffalo Substations

TL-07-1365
Early 2010
2005-WC-N4
Otter Tail Power Company, Xcel Energy

Rugby Wind Project
Expansion of 115 kV capacitor at Paynesville from 20 MVAR to 30 MVAR

Not Required
Late 2007
2007-WC-N1
Great River Energy,
Xcel Energy
Mayhew Lake
Distribution Substation
Permitted locally – Stearns County
Mid 2008