| 1.0 Executive Summary |
1 |
| 2.0 Biennial Report Requirements |
7 |
|
2.1 Generally |
7 |
|
2.2 Reporting Utilities |
9 |
|
2.3 Certification Requests |
10 |
|
2.4 General Impacts |
10 |
|
2.5 Renewable Energy Standards |
12 |
|
2.6. Distribution Report/Grid Modernization |
12 |
|
2.7. Non-Wire Alternatives |
13 |
|
2.8. FERC, MISO and Commission Actions Related to Distributed Energy Resources and Distribution Planning |
17 |
|
2.9 MISO and Minnesota's Transmission Needs |
21 |
| 3.0 Transmission Studies |
25 |
|
3.1 Introduction |
25 |
|
3.2 Completed Studies |
25 |
|
3.3 Regional Studies |
26 |
|
3.4 Load Serving Studies |
27 |
| 4.0 Public Participation |
30 |
|
4.1 Public Involvement in Transmission Planning |
30 |
|
4.2 MISO Transmission Planning |
30 |
|
4.3 MTO Website |
31 |
|
4.4 Efforts to Involve the General Public and Local Officials on Specific Projects |
31 |
| 5.0 Transmission Planning Zones |
34 |
|
5.1 Introduction |
34 |
|
5.2 Northwest Zone |
35 |
|
5.3 Northeast Zone |
36 |
|
5.4 West Central Zone |
37 |
|
5.5 Twin Cities Zone |
38 |
|
5.6 Southwest Zone |
39 |
|
5.7 Southeast Zone |
40 |
| 6.0 Needs |
42 |
|
6.1 Introduction |
42 |
|
6.2 The MISO Planning Process |
44 |
|
6.3 Northwest Zone |
47 |
|
6.4 Northeast Zone |
58 |
|
6.5 West Central Zone |
116 |
|
6.6 Twin Cities Zone |
144 |
|
6.7 Southwest Zone |
171 |
|
6.8 Southeast Zone |
192 |
| 7.0 Transmission-Owning Utilities |
215 |
|
7.1 Introduction |
215 |
|
7.2 American Transmission Company, LLC |
217 |
|
7.3 Central Minnesota Municipal Power Agency |
218 |
|
7.4 Dairyland Power Cooperative |
219 |
|
7.5 East River Electric Power Cooperative |
220 |
|
7.6 Great River Energy |
221 |
|
7.7 ITC Midwest LLC |
222 |
|
7.8 L&O Power Cooperative |
223 |
|
7.9 Minnesota Power |
224 |
|
7.10 Minnkota Power Cooperative |
225 |
|
7.11 Missouri River Energy Services |
226 |
|
7.12 Northern States Power Company |
227 |
|
7.13 Otter Tail Power Company |
228 |
|
7.14 Rochester Public Utilities |
229 |
|
7.15 Southern Minnesota Municipal Power Agency |
230 |
| 8.0 Renewable Energy Standards |
231 |
|
8.1 Introduction |
231 |
|
8.2 Reporting Utilities |
232 |
|
8.3 Compliance Summary |
232 |
|
8.4 Gap Analysis |
233 |
|
8.5 Base Capacity and RES/REO Forecast |
233 |
|
8.6 Solar Energy Standard |
236 |
|
8.7 Carbon-Free Standard |
237 |
|
8.8 Gap Analysis Summary |
238 |
| 9.0 Outages & Congestion |
240 |
|
9.1 Introduction |
240 |
|
9.2 System Changes and Upcoming Projects Addressing Congestion Relief |
240 |
|
9.3 Grid North Partners 2023 Near-Term Congestion Study |
243 |
|
9.4 Grid Enhancing Technologies (GETs) Study Summary |
245 |
|
9.5 Potential Congestion Based on Future Facility Additions |
245 |
|
9.6 Nobles County Congestion Analysis |
246 |
| 10.0 MISO LRTP |
248 |
|
10.1 Overview |
248 |
|
10.2 Tranche 1 |
249 |
|
10.3 Tranche 2.1 |
250 |
|
10.4 Future Tranches |
252 |
| 11.0 Compliance Requirements |
253 |
|
11.1 Introduction |
253 |
|
11.2 2024 Order Accepting 2023 Report Compliance |
253 |
|
11.3 Order Establishing Filing Requirements-Nobles County Substation Docket |
253 |
|
11.4 Legislative Requirements (2024 Minn. Laws, Ch. 127, Article 42, Section 52 |
254 |
|
11.5 Updated to Responses to PUC Information Requests from May 12, 2023 |
254 |
|
11.6 Congestion Order |
263 |
| Appendix A NERC 2024 Long-Term Reliability Assessment-December 2024 |
| Appendix B MN GETs Study Report |
| Appendix C Nobles Grid-Forming Battery Screening Analysis |
| Appendix D Xcel Energy Nobles Battery Economic Screening Study 2025 |