Studies and Reports > Transmission Projects Report 2025

Transmission Projects Report 2025

The 2025 Biennial Transmission Projects Report was filed with the Minnesota Public Utilities Commission on November 1, 2025. Specific projects in your area can be found in Chapter 6: Needs.

Download reports as filed: (PDF file)

AS_FILED_Biennial_Transmission_Projects_Report_10.31.25.pdf

AS_FILED_Appendix_A_NERC_Long_Term_Reliability_Assessment_2024.pdf

Read the report in sections (web pages):

01 Cover Page, List of Utilities 
02 Table of Contents
Chapter 1: Executive Summary
Chapter 2: Biennial Report Requirements
Chapter 3: Transmission Studies
Chapter 4: Public Participation
Chapter 5: Transmission Planning Zones

Chapter 6 Needs – Section 6.1 Introduction
Chapter 6 Needs – Section 6.2 The MISO Planning Process
Chapter 6 Needs – Section 6.3 Northwest
Chapter 6 Needs – Section 6.4 Northeast
Chapter 6 Needs – Section 6.5 West Central
Chapter 6 Needs – Section 6.6 Twin Cities
Chapter 6 Needs – Section 6.7 Southwest
Chapter 6 Needs – Section 6.8 Southeast
Chapter 7: Transmission Owning Utilities
Chapter 8: Renewable Energy Standards
Chapter 9: Outages & Congestion
Chapter 10: MISO LRTP
Chapter 11: Compliance Requirements
Appendix A: NERC 2024 Long-Term Reliability Assessment-December 2024
Appendix B: MN GETs Study Report (portions of this report are critical energy infrastructure information)
Appendix C: Nobles Grid-Forming Battery Screening Analysis (critical energy infrastructure information)
Appendix D: Xcel Energy Nobles Battery Economic Screening Study 2025 (critical energy infrastructure information)

Click on a zone for current projects. Click here for a high resolution map.

 

Click on a zone for information Northwest Zone - click for information West Central Zone - click for information Southwest Zone - click for information Southeast Zone - click for information Twin Cities Zone - click for information Northeast Zone - click for information